Main page / Our projects
The demolition and reconstruction of a 960-student capacity secondary school building in Khirdalan city, Absheron district, is being carried out by Azinvest İnşaat Closed Joint-Stock Company.
The school building consists of 3 floors, with a total construction area of **9,160 square meters** and a building footprint of **3,295 square meters**. The school grounds include a **450-square-meter football field**, and the total yard area measures **1.2 hectares**. Inside the building, there is a **540-square-meter indoor sports hall**.
Currently, the construction of the school building is ongoing.
The new facility includes a health center complex, four villas with pools, six smaller villas, three two-story and three-story administrative buildings, and other utility and administrative buildings.
A 4.85-hectare site in Pirshagi was renovated, including educational buildings, dormitories, a sports hall, a dining hall, and supporting infrastructure with modern "betopan" facades.
The construction of a new school for 960 students is planned in place of School No. 8 in Khirdalan city, Absheron district, following its demolition.